Preparing Phase 4 of the n_TOF/CERN facility
Περίληψη
After CERN’s Long Shutdown 2, the n_TOF facility infrastructure was largely upgraded. The biggest change is the installation of a new lead spallation target, the performance of which needs to be carefully examined. During Summer 2021, the facility’s two flight paths were characterised in terms of neutron beam energy distribution, profile and resolution. In this work, the characterisation of the facility is described and the first results are given.
Λεπτομέρειες άρθρου
- Πώς να δημιουργήσετε Αναφορές
-
Stamati, M.-E., Patronis, N., Bacak, M., Amaducci, S., Casanovas Hoste, A., Garcia Infantes, F., Manna, A., Mengoni, A., Pavon Rodriguez, J. A., Praena Rodriguez, A. J., & Spelta, M. (2022). Preparing Phase 4 of the n_TOF/CERN facility. Annual Symposium of the Hellenic Nuclear Physics Society, 28, 109–111. https://doi.org/10.12681/hnps.3610
- Τεύχος
- Τόμ. 28 (2021): HNPS2021
- Ενότητα
- Oral contributions

Αυτή η εργασία είναι αδειοδοτημένη υπό το CC Αναφορά Δημιουργού – Μη Εμπορική Χρήση – Όχι Παράγωγα Έργα 4.0 4.0.